Facilities

Synergene operates six manufacturing sites in India: Synergene Unit I in Hyderabad, our R&D centre with pilot-scale manufacturing, and five sites in Visakhapatnam that make APIs, intermediates and speciality chemicals. Two of the Visakhapatnam sites belong to our subsidiaries, Synac Pharmaceuticals and Susrutha Biosciences.

Synergene Unit I, R&D centre

Established in 2006

at Bachupally, Medchal, Hyderabad, Telangana, India

INFRASTRUCTURE

  • Land: 3500 m² (about 0.9 acres)

TEAM

  • 40 scientists, including 3 PhDs

CAPABILITIES

  • Process research and development
  • Analytical development
  • Custom synthesis
  • Pilot-scale manufacturing

QUALITY CONTROL

  • Analytical instruments: HPLC, GC, LCMS, GCMS, UPLC

Synergene Unit II

Established in 2010

at Parawada, Anakapalli District, Andhra Pradesh, India

INFRASTRUCTURE:
  • Land: 12,190 m² (about 3.0 acres)
  • Clean rooms: 6 ISO Class 8 modules

CAPACITY

  • Reactors: 57 (33 stainless steel, 24 glass-lined)
  • Reactor volume: 153 KL
  • Reactor sizes: 0.25 to 6.0 KL

EQUIPMENT

  • Special equipment: Pressure reactors up to 35 kg/cm²; cryogenic reactors down to −110 °C
  • Isolation and drying: Centrifuges, agitated Nutsche filter dryers (ANFD) and rotary cone vacuum dryers (RCVD)
  • Finishing: Milling, sifting, blending and micronisation (air jet mill)

QUALITY CONTROL

  • Analytical instruments: HPLC, GC (including headspace), UV and FTIR spectroscopy, particle size analyser

REGULATORY

  • Inspected by the USFDA, PMDA and ANVISA
  • FEI number: 3010634351
  • D-U-N-S number: 854128517

Synergene Unit III

Established in 2019

at Parawada, Anakapalli District, Andhra Pradesh, India

INFRASTRUCTURE:
  • Land: 9,328 m² (about 2.3 acres)
CAPACITY:
  • Reactors: 57
  • Reactor volume: 385 KL

EQUIPMENT

Synergene Unit IV

Established in 2018

at Parawada, Anakapalli District, Andhra Pradesh, India

INFRASTRUCTURE:
  • Land: 8,548 m² (about 2.1 acres)
CAPACITY:
  • Reactors: 51
  • Reactor volume: 172 KL

INFRASTRUCTURE:

  • Land: 8,548 m² (about 2.1 acres)

INFRASTRUCTURE:

  • Land: 8,548 m² (about 2.1 acres)

Susrutha Biosciences

Established in 2022

at Atchutapuram, Anakapalli District, Andhra Pradesh, India

INFRASTRUCTURE:
  • Land: 7,950 m² (about 2.0 acres)
CAPACITY:
  • Reactors: 20
  • Capacity: 96 KL (Planned expansion to about 180 KL)

Synac Pharmaceuticals

Established in 2023

at Parawada, Anakapalli District, Andhra Pradesh, India

INFRASTRUCTURE:
  • Land: 50,019 m² (about 12.4 acres)
CAPACITY:
  • Reactors: 21
  • Capacity: 114 KL (Infrastructure ready for a further 700 KL)